Schedule software introduction

Use the form on the right side to schedule trial introduction with our team โžก๏ธ

Shoreline Wind offers a suite of market-leading products that use intelligent data integration and simulation software to optimise and execute wind farm logistics, installation and field services strategies.

 

GAIN ACTIONABLE, DATA-BASED INSIGHTS

Break free from the limitations of customized ERP and maximize production capability and revenue with accurate and realistic full lifecycle modelling.

 

INCREASE PRODUCTION AND AVAILABILITY

Vastly reduce manual input and costly human error by leveraging the power of automation to generate work orders, assign personnel and manage resources.

 

CONNECT PEOPLE AND DATA ACROSS PROJECTS

Achieve safer and more responsive operations and increase cross-collaboration among teams by connecting people and data across projects and lifecycle phases.

 

QUICKLY IDENTIFY AND RESOLVE BOTTLENECKS

Save up to 10% OPEX by optimizing scheduling, replanning, dispatching and deployment with real-time complex field service scenario visualizations.

Login

Whitepaper: How Robust O&M Plans Boost the Profitability of Offshore Wind Farms

The offshore wind industry faces intensified O&M challenges from the deployment of larger turbines and the management of aging fleets. These challenges threaten project efficiency, durability, and profitability, underscoring the need for updated O&M strategies. Shoreline Wind's new report, โ€œ๐‡๐จ๐ฐ ๐‘๐จ๐›๐ฎ๐ฌ๐ญ ๐Ž&๐Œ ๐๐ฅ๐š๐ง๐ฌ ๐๐จ๐จ๐ฌ๐ญ ๐ญ๐ก๐ž ๐๐ซ๐จ๐Ÿ๐ข๐ญ๐š๐›๐ข๐ฅ๐ข๐ญ๐ฒ ๐จ๐Ÿ ๐Ž๐Ÿ๐Ÿ๐ฌ๐ก๐จ๐ซ๐ž ๐–๐ข๐ง๐ ๐…๐š๐ซ๐ฆ๐ฌโ€ highlights the urgent need for a comprehensive review of existing O&M strategies as the industry matures globally and enters new territories.

Key insights from the report:

  • A sophisticated O&M approach is crucial to manage the risks posed by larger turbines and maintain critical components like foundations, substations, and cables.
  • Tailored strategies are needed for aging offshore wind assets, especially those over a decade old, as their numbers are set to triple in the next four years.
  • Proactive O&M planning should start even before commissioning to ensure a seamless transition from construction to operation.
  • O&M plans must be adapted to regional conditions, considering local challenges, climate, and supply chain constraints.

Resources

The wind industry is in motion like never before. Stay informed with news and events covering the latest global wind renewable topics and trends.

All resources

Whitepaper: How Developers Can Reduce Construction Delays at Offshore Wind Farms

Whitepaper Download

New Collaboration with TEPCO Renewable Power and Shoreline Wind to Enhance O&M Strategy for Offshore Wind Projects

Success Story Read more

Shoreline Wind has been selected by Ocean Winds to deliver NextGen CMMS software for offshore wind projects.

Posts Read more

Reducing offshore wind O&M costs while increasing resource efficiency.

Posts Read more

Simplify maintenance management with powerful software

Webinar Download

Subscribe to our eNewsletter

Gain an insiderโ€™s view of cross-sector specific news, issues and policies impacting wind renewables and receive timely updates about the latest industry events and activities.

Wind industry memberships with