Login

Modeling pre-assembly of floating wind farm projects in Japan

Join in on a demonstration of how you can model pre-assembly and port logistics for floating installations in the deep waters off Japan's coast with the upgraded capabilities of the Construction Design solution.

Download Webinar

What to gain from the webinar?

Join in on a demonstration of how you can model pre-assembly and port logistics for floating installations in the deep waters off Japan's coast with the upgraded capabilities of the Construction Design solution.

Exclusive feature demonstration:

  • Ability to model assembly at port
  • Modeling for welding, mounting, bolting, and casting at the pre-assembly yard and storage area
  • Installation of WTGs onto the foundation at sea / in wet dock

Related Resources

The wind industry is in motion like never before. Stay informed with news and events covering the latest global wind renewable topics and trends.

Floating offshore wind – Great global potential comes with high risk and uncertainty

Posts Read more

Leading Japanese EPC firm JGC utilizes Shoreline simulation solution for accurate cost and scheduling estimations for offshore wind project planning

Posts Read more

Four reasons you should use agent-based simulations for your wind projects.

Posts Read more

Subscribe to our eNewsletter

Gain an insider’s view of cross-sector specific news, issues and policies impacting wind renewables and receive timely updates about the latest industry events and activities.

Wind industry memberships with

WindEurope Annual 2023